Home Page FAQ Guidelines POST A JOB! FIND A JOB! Post My Resume! Advertise Contact Us
Job Seekers & Recruiters - FORUM


powered by
FreeFind
Recruiters
Browse resumes by job category
Search For Jobs
Resources for job seekers
FORUM
Latest Job Market NEWS

Get a Resume That Gets Results!
  Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin
Resumes
 Job Information Exchange Forum : Maxtor : Resumes
Message Icon Topic: Catherine Do-Resume for Material Planning/Managing Post Reply Post New Topic
Author Message
hoaimy
Newbie
Newbie


Joined: 10 Jun 2006
Online Status: Offline
Posts: 1
Quote hoaimy Replybullet Topic: Catherine Do-Resume for Material Planning/Managing
    Posted: 10 Jun 2006 at 9:51pm
CHAU CATHERINE DO

                                                         3487 Valley Vista Dr.

                                                         San Jose, California 95148

                                                         chaudo95@yahoo.com

                                                                            H (408) 223-0723     C (408) 318-0439

                                                                                               

JOB OBJECTIVE

A position in the area of Material Planning/Managing.

 

SUMMARY

Experienced Product/Process Development Engineer and Production/Program/Materials Planner with extensive background in production planning, scheduling, and controlling flow of materials to meet production goals. Applying in-depth knowledge of Manufacturing processes and Material planning to identify problems, eliminate bottlenecks, streamline material flows, and utilize manpower and equipment. Proven skill in utilizing computerized Material Requirement Planning system and Project management.

 

Technical Skills:                                                 

·         Strong background in surface analysis using FT-IR, ESCA and Auger techniques, SEM/EDX analysis.

·         Familiarity with IBM PC (Window OS) and Apple Macintosh. Related software includes Access, Paradox, FileMaker Pro, PageMaker, MS Excel, Word, PhotoShop, Power Point, Microsoft Project.

·         Experienced in SAP and J.D. Edwards.

·         Familiarity with ISO 9001, SPC, and internal audit technique.

 

Interpersonal Skills:                                           

·         Ability to brainstorm, organize and harness group efforts for research-oriented projects.

·         Ability to work independently under pressure, and to handle many tasks simultaneously.

·         Ability to access needs, analyze, and solve problems in a fast paced environment.

·         Dependable and flexible individual who functions well both independently and as part of a team.

·         Self-motivated, reliable, detail oriented, and a contributed team player.

 

EXPERIENCE

Maxtor Corporation , Milpitas, CA – Disk Drive Division                                      2002-Present

 

Strategic Commodity Manager

Responsible for the production planning and inventory management in term of planning/communication with production management and customer service. Procurement responsibilities include qualifying vendors, materials negotiating, and tracking purchase orders per each product line.

·         Maintaining and tracking Build Plan Schedule, Time Line for new product/programs.

·         Reduce inventory shortages through timely acquisitions and increase in On-time delivery.

·         Coordinate and tracking materials/programs to monitor Supplier per product line.

·         Manage the procurement of raw materials and supplies to targeted inventory levels, and to meet Program Time Line.

·         Manage suppliers on cost reduction, and materials negotiating to support changing demands.

 

Avanex Inc., Fremont, CAPhotonic Processors Manufacturing                                                2000-2001

 

Senior Production Planner

Responsible for New Products scheduling, planning and managing BOM structure’s activities, developing & maintaining weekly build schedules, MRP planning, resolving daily production issues, controlling Work In Process inventory, directing flows of materials, managing Work Orders, ECO implementing, production readiness reviewing, and supporting project/process improvement.

·         Planned, and monitored the new product/materials for the execution of photonic processors Mfg. build from Engineering stage to Production stage in 1 week ahead of schedule.

·         Directed, scheduled, and coordinated activities of product component vendor changes that resulted in a 15% cost reduction.

·        Planned and scheduled materials for complex production projects that involving the coordination of procurement and movement for thousands of parts, resulting in on-time shipment delivery.

 

Samsung Information Systems America, San Jose, CA - Drive Division                     1999-2000

 

Program/Material Planner

Responsible for planning and monitoring the program/material of the completed drive build from Prototype stage to Transferable stage. Recognized as an expert in Inventory Control and built a reputation, with production for never leaving them without needed parts and with management for never having too many parts in storage.

·         Developed and executed a procurement and inventory planning management strategy for assigned product lines in less than 2 weeks.

·         Reviewed and approved component procurement authorizations from external suppliers to support forecasts and procurement strategy, which saved ˝ millions dollars annually.

·         Worked with suppliers on performance of new materials in accordance with established standards within the limited time allowance.

·         Interfaced with various company functions, and work closely with Engineering to support the timely transferable of New Programs to Manufacturing in 3 weeks ahead of schedule.

 

KOMAG, Inc., San Jose, CA – Recording Media Industry                                               1987-1998

 

Product/Process Development Engineer (1991-1998)                                                                               

Responsibilities began at product conception and extend through final product release. Formed and led cross-functional teams to assess problems and obstacles to the transition of New products. A proven track record of developing manufacturing techniques and new process; project management to ensure completion of projects on time and to customers specification; generating and issuing process instructions to enable product manufacture.

·         Resolved delivery problems that resulted in shipping products 1 month ahead of schedule.

·         Served as a liaison role between Engineering, Quality, Manufacturing, and Marketing on building the new prototype for customer approval in compressed 1 month time frame.

·         Created the ECO’s for volume line-trial launching, and Corrective actions for retesting the customer returns products, which resulted in the increase of 15% gross profit.

·         Developed and implemented new inspection strategies, new processes, and new equipment for the method of defect screening, resulting in reducing the failed yield percentage from 50% to 15%.

·         Generated and issued the new process instructions for improving the miss-labeling problem, resulting in reducing the in-corrected shipment percentage from 15% to 3%.

 

R&D Engineering Technician (1987-1990)              

Responsible for performing and carrying out various tasks in Failure Analysis and Tribology areas:

·         Performed failure analysis investigation; defect testing, defect mapping, optical microscopic inspecting, optical testing, and SEM/EDX for identification of defects material on the disk.

·         Performed Tencor, TMS, AFM measurement of disks’ surface roughness, AFM, Micro XAM for bump height measurement, FTIR measurement of lubricant thickness on thin film media disks, Zygo measurement for ABS profile, and LDJ coercivity measurement.

·         Installed, built, and maintained the CSS testers for analyzing friction/stiction data & accelerated corrosion data.

·         Maintained software upgrades and modifications for CSS routine summary printout, and graphic representation – Installed database programs for CSS data management.

EDUCATION

    B.S. Chemistry, San Jose State University, San Jose, California.



Edited by hoaimy - 10 Jun 2006 at 9:54pm
IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.063 seconds.




Download Popcorn only from Roxio.com
Host Unlimited Domains on 1 Account